Estimation
A project-level estimate scale (label, points, minimum and maximum days) and a capacity basis: team velocity or working days. The scale also sets the Planning Poker cards.
When to use it
When you want to define the project's estimate scale or choose whether Planning counts capacity in velocity or in working days.
Start here
Pick a capacity basis and an estimate scale, then save.
How to use it
- Under "Capacity basis", choose "Team velocity (points)" or "Working days". This sets where the Planning tab gets each sprint's capacity.
- In "Working days" mode, read the line under the two options: it shows how many days per point your scale averages, or warns that no row has a day range yet.
- Under "Estimate Scale", click one of the built-in template cards to load its labels and values into the table below.
- Alternatively click the "Custom" card to define your own labels and day ranges.
- Edit the table: each row has a "Label", "Points (numeric)", "Min Days" and "Max Days".
- Click "Add row" below the table to add a row, or hover over a row and click the X at its right to remove it.
- Click "Save Changes" when you are done. The button stays disabled until you change something.
Good to know
- The scale also sets the cards for new Planning Poker rooms: choose "Project scale" under "System" there and the deck follows the labels you save here.
- "Team velocity (points)" is the default: each sprint holds the team's velocity. "Working days" turns sprint weeks x 5 x contributing team members into points using the scale's median days per point. Work is still allocated in points.
- Working days mode needs at least one scale row with Max Days above 0 and at least one contributing team member, otherwise generating a plan shows an error. A velocity typed on the Planning tab still takes priority.
- A label is 1 to 3 characters and unique, points must be above 0, and Min Days cannot exceed Max Days. A save that breaks a rule shows the reason and stores nothing. Saved changes apply from the next plan you generate.