Utilization
How much of each team member's time is used, from logged hours, as tiles, a chart and a heatmap.
When to use it
When you want to know who is overloaded or under-used.
Start here
Choose a period. This view fills in as the team logs time in Time Tracking.
How to use it
- Choose "Weekly" or "Monthly" with the toggle at the top right.
- Choose how far back to look in the dropdown next to it. Weekly offers the last 4, 8, 12 or 16 weeks; monthly offers the last 3, 6, 9 or 12 months.
- Read the four summary tiles: "Avg Utilization", "Total Hours", "Billable" and "Peak Period" (the period with the most hours, plus a count of members over capacity).
- Read the "Hours by Period" chart. Each bar splits hours into "Billable", "Non-Billable" and "Remaining Capacity"; hover a bar to see that period's utilization percentage.
- Scan the "Member Utilization Heatmap". Each row is a team member and each column a period, with hours and a percentage in every cell.
- Use the colors to spot problems: green is under 80 percent, amber is 80 to 99 percent and red is 100 percent or more. The footer row and "Total" column give the totals.
Good to know
- The figures come from hours logged against the project. With no time logged the chart shows "No time logged in this range."
- Capacity is counted as 40 hours a week (8 hours per weekday in a month) for each active team member.
- Switching between weekly and monthly resets the range to 8 weeks or 3 months.
- Members listed come from the project's team. With no team members, the heatmap shows "No team members found for this project".
- The page is read-only. Change the underlying hours on the time tracking tab.