How much of each team member's time is used, from logged hours, as tiles, a chart and a heatmap.

When to use it

When you want to know who is overloaded or under-used.

Start here

Choose a period. This view fills in as the team logs time in Time Tracking.

How to use it

  1. Choose "Weekly" or "Monthly" with the toggle at the top right.
  2. Choose how far back to look in the dropdown next to it. Weekly offers the last 4, 8, 12 or 16 weeks; monthly offers the last 3, 6, 9 or 12 months.
  3. Read the four summary tiles: "Avg Utilization", "Total Hours", "Billable" and "Peak Period" (the period with the most hours, plus a count of members over capacity).
  4. Read the "Hours by Period" chart. Each bar splits hours into "Billable", "Non-Billable" and "Remaining Capacity"; hover a bar to see that period's utilization percentage.
  5. Scan the "Member Utilization Heatmap". Each row is a team member and each column a period, with hours and a percentage in every cell.
  6. Use the colors to spot problems: green is under 80 percent, amber is 80 to 99 percent and red is 100 percent or more. The footer row and "Total" column give the totals.

Good to know

  • The figures come from hours logged against the project. With no time logged the chart shows "No time logged in this range."
  • Capacity is counted as 40 hours a week (8 hours per weekday in a month) for each active team member.
  • Switching between weekly and monthly resets the range to 8 weeks or 3 months.
  • Members listed come from the project's team. With no team members, the heatmap shows "No team members found for this project".
  • The page is read-only. Change the underlying hours on the time tracking tab.