Docs / Deliver

Velocity

How much work the team finishes per sprint, with rolling averages and a trend chart. Sprints are logged by hand.

When to use it

When you want to know your real pace, to plan the next sprint realistically.

Start here

Click "+ Log sprint" and enter what was committed and completed.

How to use it

  1. Click "+ Log sprint" at the top right.
  2. Type a "Sprint label" such as Sprint 12. This and "Completed points" are the two required fields.
  3. Enter "Completed points", and optionally "Committed points", a "Start date", an "End date" and "Notes" on what went well or badly.
  4. Click "Log sprint" in the form to save. Repeat at the end of each sprint.
  5. Read the summary cards: "Overall avg", "Rolling 3-sprint", "Rolling 5-sprint" and "Trend", which shows up, down or stable.
  6. Use the "Sprint velocity chart" to compare committed and completed points for each sprint against the two rolling averages.
  7. To correct an entry, click "Edit" on its row in the table and click "Update sprint", or click "Delete" to remove it.

Good to know

  • Sprints here are entered by hand. Nothing on this tab is filled in from the Planning tab.
  • The summary cards and chart only appear once at least one sprint has been logged.
  • The rolling averages are shown in points per sprint and appear on the chart as dashed lines.

Related

Last updated 4 October 2026