Docs / Strategy
Roadmap
A visual roadmap built from your backlog features, goals and initiatives. Switch between Now/Next/Later, by goal, by initiative, by stream and a timeline.
When to use it
When you need to show stakeholders what is coming and in what order.
Start here
Pick a view. In "Now / Next / Later" you can also filter, rename or hide columns, and drag cards between them. "Save View" keeps the view type and its column settings, and a saved view can be shared by link.
How to use it
- Pick a view with the pills at the top: "Now / Next / Later", "By Goal", "By Initiative", "By Stream" or "Timeline".
- In "Now / Next / Later", drag a feature card between the Now, Next, Later, Someday and Unscheduled columns to set when it is planned.
- In the flat "Now / Next / Later" board, click "Filter" to narrow the cards by priority (critical, high, medium, low) and by stream. "Clear all" resets the filters.
- In "Now / Next / Later", use the sliders button to rename or hide columns, and the three icons beside it to switch between a flat view and swimlanes by stream or by initiative.
- In "Timeline", pick a zoom with W, M or Q. Drag a bar to reschedule it, drag a bar's edge to create a dependency link, and click a link to delete it. "Full page" opens a larger chart.
- To add to the timeline, click the button named after your top backlog level (for example "Add Feature") and enter its name, dates and stream, or click "Add Dependency" to link two features.
- Click "Save View", enter a name, and optionally tick "Create shareable public link" with an optional password. Saved views appear in the "Saved:" bar; click one to load it.
- Click "Export" for PNG, PDF or Excel. The expand icon next to "Save View" presents the roadmap full screen without the toolbars; click "Exit" at the top right, or leave full screen, to come back.
Good to know
- The roadmap is built from your backlog features. "By Goal" and "By Initiative" show only what you created and linked in the Goals and Initiatives tabs, and "By Stream" uses the streams created in the Backlog tab.
- Dragging a card in "Now / Next / Later" changes the feature's timeframe itself, not just this view. Moving a card to Unscheduled clears its timeframe.
- A saved view keeps the view type and the column names and visibility. It does not keep the priority and stream filters.
- Filtering applies to the flat "Now / Next / Later" board. The column and swimlane controls are also available only in "Now / Next / Later".
- "Add Dependency" on the Timeline is disabled until the project has at least 2 features. On a saved view with a public link, a link icon shows the link to copy.
Related
Last updated 6 October 2026