Docs / Plan
Overview
The project's home page: status, dates, currency, overall progress, ticket codes and milestones.
When to use it
To check where the project stands, change its basic settings, or add milestones.
Start here
Read the progress bar, then use "Add Milestone" for the key dates. The flow below shows the usual path.
How to use it
- Read the header card for the project's name, description, start and target dates, currency, methodology, backlog structure and creation date.
- Use the status drop-down at the top right to set the project to Draft, Active, On Hold, Completed or Archived.
- Click "Edit" to change the name, description, status, currency, start date or target date, then click "Save Changes". The target date cannot be earlier than the start date.
- Check the counters (Features, Epics, Stories, Completed, Total Points, Done Points) and the "Overall Progress" bar to see how much story-point work is finished.
- Under "Ticket Codes", check the prefix (new projects get one automatically). If none is set, or you click "Change" before any codes exist, type 2 to 12 uppercase letters or numbers and click "Save Prefix" so new items get codes such as PROJ-001.
- If the project already has stories, click "Assign Missing Codes" to give existing items codes too.
- Under "Milestones", click "Add Milestone", enter a name and target date, choose Upcoming, In Progress, Completed or Missed, and click "Add Milestone" again to save.
- Hover over a milestone to show its edit and delete icons.
Good to know
- Methodology and backlog structure are fixed when the project is created. The Edit dialog shows both as read-only with "Cannot be changed after creation".
- The prefix can be changed only while no ticket codes have been issued; once the counter moves past zero the "Change" button is no longer shown.
- The progress percentage is Done Points divided by Total Points.
- "Delete Project" in the Danger Zone permanently deletes the project with its features, epics, stories, dependencies, sprints, team members, streams and cost data. It cannot be undone.
Related