Docs / Deliver
Time Tracking
A timer and timesheets. Log time against the project, submit your weekly timesheet, and review teammates' submitted weeks if you have approval permission.
When to use it
When you bill by time, or need to see where the hours go.
Start here
Click "Start" on the timer, or add a row to log time you have already spent.
How to use it
- To time work as you do it, optionally pick a code in "Code (optional)", type what you are working on, and click "Start". Click "Stop" when you finish and a message shows the hours logged.
- To log time after the fact, open the "Time Log" tab. Use the arrow buttons, or "Today", to choose the week, which runs Monday to Sunday.
- In a row, select a "Timesheet Code", add an optional description, and type hours in a day's cell. The cell saves when you click out of it. Click "Add Row" for another line.
- Check the "Daily Total" row and "Week total", then click "Submit Timesheet" to send the week for approval.
- Open the "Timesheets" tab to see your own weeks with status, total hours and billable hours. If your role has approval permission, a "Team approvals" section above lists teammates' submitted weeks: "Show days" reveals the hours per day, and "Approve" or "Reject" records the decision.
- When a week is rejected, you can type a reason. It is shown in the "Notes" column and the week can be edited and submitted again.
- Open the "Codes" tab and click "Add Code" to define your own. Give a code (up to 20 characters, shown in capitals), a name, a category of "Billable", "Leave" or "Non-Billable", and an optional description.
Good to know
- The badge at the top shows the status of the week you are viewing: draft, submitted, approved or rejected. A submitted or approved week is locked and cannot be edited; only draft and rejected weeks show "Submit Timesheet".
- Choosing a code on a row sets that row as billable or not, based on the code's category. Each day's hours must be between 0 and 24, and a timer left running is stopped at 24 hours.
- You cannot approve or reject your own week. The project owner is the exception, so a solo owner can run the whole flow. A week can also be approved through an approval request for it.
- Use the switch on a code to deactivate it. Deactivated codes cannot be chosen for new entries, and existing entries keep their data.
- Your logged time is matched to your team member on the project. Invoicing (approved timesheets), Utilization and PS Financials use that link, so check generated invoice line items and rates before sending.
Related
Last updated 6 October 2026